Equipment Design & Application

VEB-006: Medium-Voltage Harmonic Filter Design: Engineering for Reliability

  • Problem: Marginal filter designs based on idealized models often lead to component overheating and premature failure in real-world field conditions.
  • Solution: A System-Fit™ approach utilizing significant conservatism in capacitor, iron-core reactor, and resistor ratings to ensure long-term reliability.
  • View HTML | Download PDF

VEB-004: Steps Versus Stages and Stage Size

  • Problem: Interchangeable use of “steps” and “stages” leads to confusion in control resolution, switching duty, and equipment cost during the specification phase.
  • Solution: Guidance on selecting optimum stage weighting and sizes based on voltage rise, load profile, and switching economics.
  • View HTML | Download PDF

System Protection & Blown Fuse Detection

VEB-001: Direct Blown Fuse Detection

  • Problem: Traditional indirect unbalance schemes fail to detect fuse thermal failure in compact, medium-voltage metal-enclosed banks.
  • Solution: Implementation of direct fuse sensing with thermal actuation to provide unambiguous indication and prevent catastrophic enclosure damage.
  • View HTML | Download PDF

VEB-002: Split-Wye Neutral Current Detection

  • Problem: Identifying the most robust indirect unbalance method for ungrounded double-wye capacitor banks.
  • Solution: Utilizing neutral CTs to provide sensitivity to internal unbalance while remaining immune to external system voltage unbalance and remote ground faults.
  • View HTML | Download PDF

VEB-003: Single-Wye Neutral Voltage Detection

  • Problem: Assessing the limitations and switching-duty concerns associated with neutral PTs in single-wye ungrounded banks.
  • Solution: A practical guide to setting relay thresholds (Alarm/Trip) and navigating the risks of PT saturation and restrike.
  • View HTML | Download PDF

Transient Analysis & Mitigation

VEB-007: Capacitor Bank Switching: Peak Inrush Current

  • Problem: High-frequency back-to-back switching transients cause contact erosion, micro-welding, and subsequent restrikes in switching devices.
  • Solution: Evaluation of device technologies (Vacuum, SF6, Oil) and the application of Transient Limiting Inductors (TLIs) or Point-on-Wave switching.
  • View HTML | Download PDF

VEB-008: Capacitor Bank Outrush & Close-in Fault Analysis

  • Problem: Energized capacitor banks discharging into nearby faults can expose adjacent “Victim Breakers” to currents exceeding their making capability.
  • Solution: Standards-based evaluation of breaker classifications (C0, C1, C2) and the use of outrush reactors to protect substation safety.
  • View HTML | Download PDF

VEB-009: Reactor-Limited Fault TRV and Breaker Duty

  • Problem: Air-core reactors can impose severe Rate-of-Rise-of-Recovery Voltage (RRRV) that exceeds the dielectric recovery capability of standard breakers.
  • Solution: A methodology for calculating duty-adjusted breaker capabilities and optimizing surge capacitor sizing to mitigate TRV peaks.
  • View HTML | Download PDF

Specialized Engineering Challenges

VEB-005: Insulation Coordination for High-Altitude Power Systems

  • Problem: Automatically specifying higher BIL equipment at altitude results in inflated costs, larger footprints, and procurement difficulties.
  • Solution: Rigorous insulation coordination using surge arresters to utilize standard equipment ratings at elevations exceeding 1,000 meters.
  • View HTML | Download PDF

VEB-010: Preliminary Sizing and Performance of Motor Starting Systems

  • Problem: Large motor starts impose severe voltage sags that reduce starting torque and disturb connected plant equipment.
  • Solution: Using the MotorVAR steady-state impedance method to estimate voltage performance and torque margin for various starting configurations.
  • View HTML | Download PDF

Technical Support

Need assistance with a specific application? VarStec combines practical engineering expertise with specialized equipment solutions.